1
|
PPP/TE 12/93 (sub-contract & supervised) Cadangan Membina Rumah Pam, Lurang/ PDC Pam, Kebuk Pengagihan Serta Membekal, Memasang, Menguji Mentauliahkan Pam-Pam Submersible Dan Kerja-kerja Bersangkutan Di Taman Perindustrian Bukit Tengah Seberang Prai. |
Leow Ah Sai & Sons SB PDC
|
16/6/93 –8/12/93 |
1,829,144.00 |
2
|
PPPP/TE24/93 (sub-contract & supervised) Cadangan Membina Jalan, Parit, Saluran/ PDC Pembetungan, Kerja-kerja Telekom & Kerja-kerja Bersangkutan Di Taman Perindustrian Bukit Minyak Fasa 1A & 1C, Seberang Prai. |
Leow Ah Sai & Sons SB PDC
|
3/11/94 –26/4/95 |
6,632,595.00 |
3
|
Road, drainage, box culvert & other related earth work for Cititel, Penang Road, Penang. |
Cahaya Utara(Tan & Tan) Arup Jururunding SB
|
8/10/97 –25/12/97 |
122,739.00 |
4
|
To resurface existing double carriage way road For “Cadangan Mendirikan Pejabat Jualan, Pusat Service & Gudang Di atas Plot 57, Jalan Perindustrian Bukit Minyak, MK 13, S.P.T. |
UMW Industries ADM
|
26/5/98 –12/6/98 |
144,000.00 |
5
|
Road, drainage, box culvert & others related earth work for new Caltex Petrol Station at Bukit Minyak, Seberang Prai Tengah. |
Teh Construction Caltex Malaysia
|
11/8/98 –30/10/98 |
83,115.50 |
6
|
To construct RC retaining wall, rubble pitching retaining wall, road & drainage for Rich Focus Corp. Sdn Bhd at Bayan Baru, Penang. |
Rich Focus ARUP Jururunding S/B
|
25/2/99 –15/8/99 |
399,455.75 |
7
|
Box culvert, U-drain, RC outfall & others related earth work for Desa Pantai Indah, Sg.Batu, Teluk Kumbar, Pg. |
Viva Hill JNK Consultant
|
6/9/99 –6/12/99 |
390,000.00 |
8
|
Road, drainage, box culvert & others related work for Gleanegles Medical Centre, Jalan Pangkor, Pg.
|
Daya Antara ARUP Jururunding
|
15/9/99 –31/12/99 |
177,088.00 |
9
|
Road, drainage, box culvert, rubble retaining wall & others related work for Proposed Desa Pantai Indah, Sg.Batu, Teluk Kumbar, Pg
|
Viva Hill JNK Consultant
|
1/6/00 –31/5/01 |
1,136,000.00 |
10
|
Proposed Site Clearance & Renovation At No1Jalan Air Terjun, Penang |
Saudajana Contract SB ADM
|
1/8/06 –31/12/06 |
37,994.90 |
11
|
Proposed Upgrading Of Road, Drainage & Others Related Work At Venture Electronics Services Sdn Bhd, Bayan Lepas, Penang |
Venture Electronics Services SB |
18/6/07 –7/10/07 |
500,000.00 |
12
|
Cadangan Kerja Jalan & Parit Untuk 4 Blok Rumah Pangsa & 6 Tkt Tempat Letak Kereta Di Lorong Semarak Api 3, Farlim, Penang |
Asia Green Development SB Arup Jururunding SB
|
1/12/05 –19/12/07 |
1,256,166.24 |
13
|
Proposed 120x900 Box Culvert Joining External Monsoon Drain, FIZ II Bayan Lepas Penang |
AMD Export Sdn Bhd MEI Consultants Sdn Bhd
|
1/4/08 –30/4/08 |
126,000.00 |
14
|
Proposed Raw Materials Yard # 1 Stacker earth work, fill with crusher run, earth drain, access road, fence & gate |
Ann Joo Integrated Steel Pakatan Runding Yusoff
|
20/09/08 –5/12/08 |
892,160.00 |
15
|
Proposed Level & Lay Crusher Run At Parcel 12 & 13 car park area, Queensbay Mall, Penang. |
CP Landmark Sdn Bhd Tanigra Construction Sdn Bhd
|
16/3/2009 –30/4/09 |
120,000.00 |
16
|
Road & Drainage Works – Cadangan Untuk Mendirikan 1 Blok Hotel 14 Tgkt (323 Bilik) Dan 3 Tgkt Basement Tmpt Letak Kereta Di atas Plot 5500 Eastin Hotel, Queensbay Pg. |
CP Landmark Sdn Bhd APEC Engineering Consortium Sdn Bhd
|
6/4/2009 –30/9/09 |
755,376.20 |
17
|
Proposed Main Entrance Slip Road From Bayan Lepas Express Way For Cadangan Mendirikan 1 Blok Hotel 14 Tkt (323 Bilik) & 3 Tkt BasementTempat Letak Kereta Di Sg Nibong DBD, Pg.
- Eastin Hotel
|
CP Landmark Sdn Bhd APEC Engineering Consortium Sdn Bhd
|
1/10/09 –31/10/09 |
531,974.19 |
18
|
Cadangan Membina Jln & Parit Utk Rumah 2 Tkt x 4, Berkembar 2 Tkt x 28 & Teres 2 Tkt x 51 Di Atas Lot 300, Mkm 3, DBD Jln Sg Pinang, PP |
BSK Concept Zone Jimmy Khoo Consulting Engineering
|
01/10/09 –30/10/10 |
1,809,232.00 |
19
|
Proposed Design & Build Of Internal Driveway Additional Car Park & Covered Walkway for Spansion (Pg) Sdn Bhd
- Phase II Bayan Lepas FIZ, Penang.
|
Spansion (Pg) S/B CS Woon Consultant
|
01/08/10 –31/08/10 |
116,000.00 |
20
|
To Resurface Building 1 To 5 Premix Road & Related Works At IDT Penang
|
Integrated Device Technology (Malaysia) Sdn. Bhd.
|
13/9/14 - 30/10/14 |
150,000.00 |
21
|
Additional Parking Space At Front Lobby Area - SAM PE3 Penang
|
Meerkat Precision Sdn Bhd
|
16/3/23 - 10/4/23 |
123,186.00 |
22
|
To Construct Perimeter Drain & Detention Box Culvert At Bukit Dumbar, Penang. For Inma Development Sdn. Bhd.
|
Wee Lian Construction Sdn Bhd
|
16/2/23 - 12/4/23 |
113,940.00 |
|